subject: Breaking Force Decides The Strength Of Motor Part [print this page] Breaking force decides the strength of motor part
Breaking force decides motor part strength
Set roll breaking as an example, it is borrowed from the spindle on the rings to install Moving cone separately, the moving cone hanging people rack, then rack the lower rib panel, put the bone wood pad, withstand cone and ensure appropriate height. At the same time, with a wooden wedge tightly fixed Cone in the middle of the rack, making its in Central. Then load beam and officers and fix the axle nuts on the top and jacket fit.
And install the moving cone and beam together, first install moving cone and beams in a special pit (repair beams and moving cone pit). Then install the entire one in the rack. When Sulfur beam and the moving cone assembly is lifted, lifting beam with wire rope, and never allow lifting spindle top of the rings 1 to avoid lifting rings cannot afford an accident. If the crane capacity allows, the best way is install beams and dynamic cone together. Compressing Moving cone liner with nut to prevent loosening. Before compression, in order to prevent rust and remove difficulty, must paint dry oil in a fixed circle (pressure on the pull) and the lower thread. When installing beams and central rack assembly, we should enable the reinforcement of the beams down to the direction of the mine shafts, in order to ensure that the ore evenly fall into crushing machine. Tolerance between beams and the middle rack of gap should be equal and no bigger than 0.5mm. The assembly should be immediately after passing the fixed pin.
In addition, the difference of hydraulic gyratory crusher and mechanical gyratory crusher at the bottom of the hydraulic cylinder be replaced by the original top of the crusher suspension and adjustment of the device, so Here are the installation by the hydraulic cylinder. Hydraulic cylinder send from the ditch to the base below with a pulley. Installation of hydraulic cylinder, the screw can lift slowly hydraulic cylinder, can also use crane hydraulic cylinder to lift. Hydraulic cylinder on the friction disc fixed to the moving cone shaft bottom, pending installation of the moving cone fashion into the hydraulic cylinder, the friction plate and friction disc center offset 30mm or so. Oil pipes and hydraulic hoses should be properly protected from the ore washed up.